Chinook Drilling Rig 15
View Major Equipment Inventory (pdf) , Rig Layout (pdf)
Depth: KB to Ground: |
3400 m Move Loads: 4.8 m, 4.35 m clear with pony subs
|
Move Loads: |
20 Summer 21 Winter |
|
| Drawworks: |
Rigmaster P750, powered by 1-Detroit 14 liter 60 Series 450 kw, w/Allison CBLT 6061 6 speed transmission, Eaton Disc 1-36 auxiliary brake. |
| Mud Pump: |
2 -Workforce-1300 triplex powered by 1-Detroit 12V2000 Series 670 kw, w/PR 800 ODR Gear box. |
| Substructure: |
Rigmaster single piece Model ST14-14.2-340D, 150,000 daN casing & 125,000 daN setback capacity, hydraulic leveling system. 0.5 m Pony Subs available |
| Mast: |
Rigmaster free standing telescopic Model T104-9.5-400D, SHL capacity 177,900 daN. |
| B.O.P. System: |
1-228.6 mm Townsend Type 84, 21,000 kpa Spherical -Nace 2-228.6 mm Townsend Type 88, 21,000 kpa Single Gate -Nace |
| Closing Unit: |
Neutron 510 liter 5 station 21,000 kpa PLC. |
| Drill Pipe: |
350 Jts – 3400 m, 101.6 mm Grade TSS-95 23.36 kg/m with 4 FH connections. 6 Jts – 101.6 mm 41.6 kg/m Hevi-Wate Drill Pipe with 4 FH connections. |
| Drill Collars: |
21-161 mm x 57 mm with 4.5 H90 connections zipped for slips. 2-228 mm x 76 mm with 7 H90 connections zipped for slips. |
| Top Drive: |
Tesco 250 HMIS 450 HP. |
| Block/Hook: |
Dreco Shorty 170-UTB, 170,000 daN. |
| Pipe Handling : |
Hydraulic Catwalk/Laydown system, Hydraulic Pipe Tubs, Model 950 H Spin Master pipe spinner. |
| Rotary Table: |
Emsco 17.5, 444 mm opening. |
| Mud Tanks: |
1 -72 m3 w/4 compartments, equipped with Poorboy degasser, 2-5x6 Mission pumps, 3 agitators, hole fill pump, 2 shale shakers, and mixing house. |
| Shale Shaker: |
2 – Brandt King Cobra Linear Motion. |
| Fuel & Water: |
15 m3 fuel & 60 m3 water. |
| Combination Building: |
Tool room, change house, generator and accumulator room. |
| Generator: |
2-Detroit 60 Series, 440 Kw, 480 Volt Stamford. |
| Boiler: |
Williams & Davis 90 Kw c/w 16 m3 water & 9 m3 fuel tank. |
Please contact our sales team for additional information or specifications not listed on this site:
This e-mail address is being protected from spambots. You need JavaScript enabled to view it
This e-mail address is being protected from spambots. You need JavaScript enabled to view it
|